Screw 17 replacement

Screw 17 replacement

D&S designed, fabricated and installed a full salt screw conveyor replacement at Port Lincoln's salt processing facility — reinforcing the existing wall with poured armed concrete, fabricating a custom support structure adapted to the site's existing infrastructure, installing two new screws connected into the existing process facilities, and replacing safety handrails, all executed within a live-plant shutdown window.

Skills/services demonstrated

  • Shutdown-constrained delivery — full equipment replacement executed inside a fixed shutdown window in a live, crowded processing environment
  • Design for adaptability — engineering a new screw and support structure to interface with existing, non-standard site infrastructure rather than a standard install
  • Structural reinforcement — reinforced (armed) concrete works to upgrade the existing wall to safely carry new structural loads
  • Fabrication to custom design — supporting structure fabricated specifically for this site’s constraints
  • Mechanical installation and process tie-in — two new screws installed and connected into the existing process facilities
  • Safety infrastructure works — handrail replacement as part of the broader scope, not overlooked amid the mechanical priority