Loss of power risk remediation

Loss of power risk remediation

Provided the civil infrastructure and equipment footings underpinning BHP's Loss of Power Risk Remediation project at Olympic Dam's North Switchyard — replacing two end-of-life 132/11kV transformers and adding a site-wide spare to protect plant operations and power supply to Roxby Downs.

Skills/services demonstrated

  • Critical infrastructure civil works — delivering to the tolerances and standards required for live high-voltage switchyard equipment (132/11kV)
  • Project and program management — weekly program/project meetings, daily site management and safety meetings, documented methodologies
  • Safety-led delivery — a dedicated Safety Management Plan (WHSMP) on a live, high-consequence switchyard environment
  • Quality assurance and records management — QA of works with maintained records throughout
  • Mobilisation and P&E management — mobilising, securing and demobilising plant and equipment on-site
  • Full civil construction scope — bulk earthworks, drainage, access roads, excavation, trenching, backfilling, concrete and foundation works
  • Precision equipment footings — purpose-built foundations for disconnectors, circuit breakers and current transformers, not just generic civil pads