Carrapateena Stage 2A tailings pipeline – Overland SMPP installation

Carrapateena Stage 2A tailings pipeline – Overland SMPP installation

The overland tailings pipeline was delivered in just 14 weeks under stringent quality and safety standards. The result is a durable, efficient pipeline system compliant with BHP’s rigorous SHEC standards, supporting ongoing operational performance at Carrapateena.

Skills/specialties demonstrated

  • In-house cold field bending capability — the PBM (Model PBMS/20″) let D&S bend high-strength steel pipe on-site rather than relying on pre-fabricated bends or an external bending subcontractor, which is the core differentiator in this case study
  • Materials handling range — comfortable working across both carbon steel and UHMWPE-lined pipe, and both coated and uncoated pipe, in the one scope
  • Certified welding, bolting and testing — on-site welding and hydrostatic testing to Australian Standards
  • Civil/structural pipeline works — sleepers, supports and anchor plinths, not just the pipe itself
  • Brownfield integration — tying new pipeline into existing TSF infrastructure without disrupting the live system
  • Safety-led equipment operation — hydraulic controls and built-in safety systems on the PBM reducing manual handling risk on a large-diameter, thick-wall pipe job