Camp potable water upgrade

Camp potable water upgrade

Executed a multi-scope infrastructure package at a mine site camp in 12 weeks — Tailings line upgrade, expanded firewater and stormwater systems, transmission pumps, process airlines, and HDPE piping works — mobilising a full trade team from installation through to commissioning.

Skills/services demonstrated

  • Multi-trade site mobilisation — supervisors, fitters, welders and operators deployed together with the plant and equipment needed, rather than a single-trade crew
  • Broad infrastructure scope in one engagement — tailings, firewater, stormwater, transmission pumps and process airlines handled as a combined package rather than separate contracts
  • HDPE fabrication and welding — vent and drain spools fabricated and precision-welded onto live/existing piping systems
  • Civil support works — trench bedding preparation to properly support new infrastructure
  • Batch plant labour support — supplementing client operations directly, not just installing fixed infrastructure
  • Equipment replacement and refurbishment — extending beyond new install work into asset renewal
  • Commissioning oversight — carrying the work through to confirmed operational readiness, not stopping at physical installation