Delivered the full civil, structural, mechanical, piping and E&A upgrade of BHP's Prominent Hill Tailings Disposal System on schedule, within a live SimOps environment — including in-house-fabricated HDPE piping spools and raised pump plinths — now fully operational and aligned to the site's 7.5 Mtpa configuration.

The challenge

Skills/services demonstrated

  • Full multidisciplinary scope in one delivery — civil, structural, mechanical, piping and E&A works integrated under one team
  • SimOps execution — significant construction carried out while the plant remained fully operational
  • Shutdown-critical tie-in management — critical works compressed into tightly managed windows without disrupting ongoing operations
  • In-house HDPE fabrication — piping spools fabricated internally rather than outsourced, called out as a standout feature of the delivery
  • Structural modification precision — pump plinths raised to meet updated design requirements
  • Full pump system replacement — installation of 3 × Warman 8/6 AHPP pump sets, plus removal of redundant pumps, cabling and infrastructure
  • Multi-material piping capability — HDPE, rubber-lined and ceramic-lined piping systems within the one scope
  • E&I integration — full electrical, control and instrumentation installation, including Hydraulic Power Unit relocation and upgrade
  • Brownfield construction and project management maturity — coordination, planning and communication across all disciplines and stakeholders in a live, complex operating environment