Client:
Location:
Carrapateena Mine, SA
Period:
February 2023
Duration:
5 Months
This project required the upgrade of the tailings line, expansion of the camp firewater system, upgrade of the LV workshop stormwater system, installation of transmission pumps, installation of process airlines, labour support for the batch plant, supply and welding of HDPE piping, and replacement and refurbishment of equipment.

This project required the upgrade of the tailings line, expansion of the camp firewater system, upgrade of the LV workshop stormwater system, installation of transmission pumps, installation of process airlines, labour support for the batch plant, supply and welding of HDPE piping, and replacement and refurbishment of equipment.

Scope of Work

The responsibilities and obligations included:

  • Material supply of HDPE piping/ fittings/ valves and supports
  • Relocation of existing underground pipework
  • Installation of new pipe supports
  • Pre-spooling of new HDPE piping for new RO tanks
  • On-site HDPE Pipe installation
  • Concreting slab for new fire hydrant location
  • Relocation of fire hydrant
  • Tie in new RO pipework/tanks to existing RP plant during shutdown
  • ITP documentation
  • MDR records
  • Weld procedures
  • Hydro methodology/test records
  • Trenching and backfilling