Location:
Murra Warra, VIC
Period:
June 2023
Duration:
5 Months
D&S delivered a range of services, including fabrication, electrical, and maintenance, to GE Renewable Energy for their Murra Warra Windfarm project. This project is situated 25km north of Horsham, nestled between the Henty Highway and Blue-Ribbon Road in Victoria's Wimmera region.

D&S delivered a range of services, including fabrication, electrical, and maintenance, to GE Renewable Energy for their Murra Warra Windfarm project. This project is situated 25km north of Horsham, nestled between the Henty Highway and Blue-Ribbon Road in Victoria’s Wimmera region. During the annual shutdown period, our client needed both a replacement and an upgrade of the rotating stabilizer, tasks that D&S successfully executed.

Scope of Work

The responsibilities and obligations included:

  • Removal of RS Cooling unit
  • Removal of RS enclosure
  • Modification / installation of access panels to RS enclosure
  • Modification to stainless steel piping on cooler pump unit
  • Installation of Air baffles inside RS Cooler
  • Fabrication
  • Electrical
  • Installation and commissioning
  • ITP documentation

Related Projects