AUXILIARY MAINTENANCE YARD PROJECT
Client: BHP
Services: Project management, Engineering
Location: Olympic Dam, SA
Period: November 2020 - January 2021

Remove sections of old fence and construct new chain mesh fence sections on new fence line with new vehicle gates and pedestrian gates.120m of completely new fence required, within that length there are 3 new 6m vehicle gates (double 2 x 3m) and a pedestrian gate. There is 25m of old fence to be removed.

SCOPE OF WORK

Fence installation at the auxiliary maintenance yard located at Olympic Dam.

Work included:

  • Supervisor to coordinate works
  • Procurement of materials
  • Risk assessments and supervise the task
  • Supply labour to perform the following tasks
    • Mobilise
    • Service Location
    • Hydro vac post holes
    • Install 120m of chain mesh fence
    • Install 3m double gates to 3 access ways
    • Remove and dispose of 25m redundant fencing
    • Demobilise
    • Electrician for service location